Change of Order of Integration Calculator

Type the limits of a double integral, innermost first, to reverse their order.

The limits of a region as they are now, innermost first: y between two curves in x, then x between two numbers.

Try

Result

You enteredy:x2 to 4; x:0 to 2y: x^{2}\ \text{to}\ 4;\ x: 0\ \text{to}\ 2

x:0 to y; y:0 to 4\displaystyle x: 0\ \text{to}\ \sqrt{y};\ y: 0\ \text{to}\ 4
Show the work
  1. The region as it is given

    The limits describe the region 0≤x≤20 \le x \le 2, x2≤y≤4x^{2} \le y \le 4: for each xx the variable yy runs between two curves.

    y:x2 to 4; x:0 to 2y: x^{2}\ \text{to}\ 4;\ x: 0\ \text{to}\ 2
  2. Boundary curves solved for the other variable

    To reverse the order, solve each boundary curve for xx in terms of yy.

    y=x2  ⇔  x=y,  y=4 (upper curve, no x in it)y = x^{2} \;\Leftrightarrow\; x = \sqrt{y},\ \ y = 4\ \text{(upper curve, no x in it)}
  3. Limits of the outer variable

    yy now runs over the whole height of the region, from its lowest point to its highest.

    0≤y≤40 \le y \le 4
  4. Limits of the inner variable

    For each yy, xx runs from the larger of the left-hand boundaries to the smaller of the right-hand ones, and one pair applies for the whole height.

    0≤x≤y0 \le x \le \sqrt{y}
  5. Check by area

    The area of the region is the same in both orders (5.333333), so the limits describe the same region.

    ∫ ⁣ ⁣∫1 dA=5.333333\int\!\!\int 1\,dA = 5.333333
  6. Result

    The limits with the order reversed, innermost first.

    x:0 to y; y:0 to 4x: 0\ \text{to}\ \sqrt{y};\ y: 0\ \text{to}\ 4

Worked examples